Mayfield
The PGG Wrightsons extension to their existing facility in Mayfield included the renovation of their existing retail area, the demolition of a garage to the rear of the retail area, the construction of a new pre-cast chemical storage facility behind the retail area and the concreting and drainage of their yard area. Geoff Read Ltd took an existing design for this project from PGG Wrightsons and made a number of changes to improve build ability and reduce the cost of construction. The works were completed on-time and budget while maintaining PGG Wrightsons access to the site and continued operations.